Notes from the shop floor
Manufacturing detail, selection arguments and test practice — written by the people who build the units. One photo essay is published; five more are in preparation.

How a gas-insulated ring main unit is actually built
Tank welding, epoxy casting, CT winding, PD test and export packing — the twelve steps between a flat stainless sheet and a tested unit on a pallet.

325 mm or 375 mm: what module width really decides
Vault drawings, cable termination room and why the module pitch is usually the first constraint a project hits, not the last.

Why 13.8 kV projects end up buying an ANSI 15 kV unit
Nominal voltage versus insulation class, and what a dual-declared datasheet lets a consultant and a utility both sign.

Where the partial discharge number comes from
A PD reading is not a pass mark: what the test circuit is, where the measurement sits, and how a 3 pC result differs from a 20 pC one.

Packing for a sea container: gas charge, pallet and 45 °C
Export packing is part of the specification. Pallet dimensions, centre of gravity and why the tank stays charged in transit.

Coastal and underground: two environments that change the spec
Salt fog and standing water are not marketing conditions — they move the enclosure class, the hardware finish and the cable box design.