1. The tank is welded, not assembled

The stainless tank is the pressure boundary and the insulation boundary at the same time. At 12 kV the dielectric strength of SF6 is roughly 2.5–3 times that of air at the same pressure, which is why the live parts can sit a few centimetres apart inside a box that fits a 325 mm module width. That only holds if the tank is gas-tight to about 0.1 % per year, so the shell is welded and then leak-tested, not bolted and sealed.

Welding the stainless tank of a gas-insulated RMU
Tank welding station — the shell is welded and flipped for the opposite seam.

2. Internal arc containment is designed in, not added later

Every weld, every internal partition and every bolt is there to satisfy IEC 62271-200. If you compare a GSRM6 ring main unit against a solid-insulated unit-type cubicle, the difference in mass is almost entirely the pressure boundary — that is what buys internal arc classification and a smaller footprint at the same short-circuit level.

Busbar run with post insulators inside a sealed tank
Busbar run with post insulators before the tank is closed.

3. Insulation parts are cast in-house

Epoxy insulators, bushings and the CT encapsulation are cast and cured on site. Winding the current transformers in-house removes a purchase-order lead time from the critical path, and it lets the winding ratio be matched to the actual feeder current instead of a stock value.

Current transformers wound and potted in-house
Current transformers, wound and potted in-house.
Epoxy insulators after cure and inspection
Epoxy insulators after cure and inspection.

4. Cleanliness is the whole game inside the tank

A 1 mm metallic particle lying on the tank floor will dance under the electric field and can trigger a flashover at a fraction of the design voltage. That is why the assembly bay is separated from the welding bay, why tools are counted in and out, and why every unit gets a partial-discharge test before it is filled.

5. Routine test before it ships

Each unit goes through power-frequency withstand, PD measurement, gas leak and a mechanical operation sequence on the mechanism. The photo below is a four-panel ring position in the test bay — the same hardware that appears in the 13.8 kV range for ANSI markets.

Four-panel RMU on routine test with relay fitted
Four-panel RMU on routine test — relay and metering panel fitted.

6. Packed for a sea container, not for a showroom

Packing is part of the specification for export projects: pallet dimensions, centre of gravity, and a gas charge that stays inside the tank at 45 °C in a container on the deck. If your project sits in a coastal plant or an underground vault, these details decide the installation week — see the notes on underground and transit applications and how each claim is traced back to a test.

Finished RMUs packed on pallets for export
Finished units on pallets, gas-filled and labelled.
Next step. Send the single-line diagram, the fault level and the vault dimensions. We come back with a module layout and a priced proposal — not a catalogue page.