Most RMU sizing failures are not calculation errors. They come from fixing the module count before the cable and fault data are known, then discovering that the tank cannot be extended. Sizing is a five-step sequence, and it runs before the drawing, not after.

Four-module GSRM6 gas-insulated ring main unit on the factory floor

Step 1: fix the fault level and its duration

The prospective fault current at the RMU position decides whether a switch-fuse way is acceptable at all. On an 11 kV urban ring, 20 kA for 4 seconds is now the common requirement; 16 kA/1 s still appears on rural loops. Both numbers belong in the enquiry.

Where the number is not given, ask the utility for the substation fault level and add the impedance of the cable run to the unit. Guessing high costs money in the switchgear; guessing low costs a rework.

Step 2: count the ways, then add the future ones

A sealed tank is ordered with a fixed module count. Retrofitting a module in the field is not practical, so the count is a permanent decision.

A four-module unit is the common answer for a single-transformer kiosk; a six-module unit appears where two transformers share a ring position. Our GSRM6 is built as 325 mm modules at 12 kV, so the room length follows directly from the count.

Step 3: check the module width against the room

Module width is fixed by voltage class and by the cable box type: 325 mm at 12 kV, 375 mm at 24 kV on the same platform. Add the cable box depth and the clearance the operator needs to rack or bolt a termination, usually 800 mm in front and 300 mm behind for a bolted box.

Voltage classModule widthTypical 4-way room lengthFront clearance
12 kV (11 kV system)325 mm1.3-1.5 m plus boxes800 mm
24 kV (22 kV system)375 mm1.5-1.7 m plus boxes800 mm
36 kV (33 kV system)C-GIS cubicle, 600-800 mm per way2.6-3.4 m1,000 mm

If the room cannot take the length, the answer is not a smaller clearance. It is either fewer ways or a different device family; see 33 kV C-GIS for the wider frame case.

Step 4: size the cable terminations

The cable box is chosen by conductor size and by how the crew terminates: bolted lugs, sliding type or elbow connectors. A 400 mm² aluminium cable needs a different box from a 95 mm² copper one, and the box adds depth to the unit that the room layout must absorb.

Ask for the cable schedule before the drawing is frozen. Changing a cable box after the tank is welded means a new box, not a new tank, but it still costs a week.

Step 5: protection and operation

The load way’s protection decides the device: fuse, relay with a motorised mechanism, or a breaker way. A fuse is cheapest and has no settings to coordinate; a relay allows remote indication and a definite trip curve.

If the unit will be operated remotely or monitored over SCADA, say so at sizing stage. Adding a motor and an RTU later is possible, adding the interlocking for it is not.

The sizing sheet in one line

Fault level and duration, way count including spare, module width against room, cable box against cable schedule, protection against operating practice. Five lines, and every one of them is cheaper to settle before the tank is welded.