How to Size a Ring Main Unit: Fault Level, Cable and Load
Most RMU sizing failures are not calculation errors. They come from fixing the module count before the cable and fault data are known, then discovering that the tank cannot be extended. Sizing is a five-step sequence, and it runs before the drawing, not after.
Step 1: fix the fault level and its duration
The prospective fault current at the RMU position decides whether a switch-fuse way is acceptable at all. On an 11 kV urban ring, 20 kA for 4 seconds is now the common requirement; 16 kA/1 s still appears on rural loops. Both numbers belong in the enquiry.
Where the number is not given, ask the utility for the substation fault level and add the impedance of the cable run to the unit. Guessing high costs money in the switchgear; guessing low costs a rework.
Step 2: count the ways, then add the future ones
A sealed tank is ordered with a fixed module count. Retrofitting a module in the field is not practical, so the count is a permanent decision.
- Two ring ways for the loop.
- One load way per transformer or per building feeder.
- One metering or VT module if the utility bills on this unit.
- One spare way if the site has any growth plan at all.
A four-module unit is the common answer for a single-transformer kiosk; a six-module unit appears where two transformers share a ring position. Our GSRM6 is built as 325 mm modules at 12 kV, so the room length follows directly from the count.
Step 3: check the module width against the room
Module width is fixed by voltage class and by the cable box type: 325 mm at 12 kV, 375 mm at 24 kV on the same platform. Add the cable box depth and the clearance the operator needs to rack or bolt a termination, usually 800 mm in front and 300 mm behind for a bolted box.
| Voltage class | Module width | Typical 4-way room length | Front clearance |
|---|---|---|---|
| 12 kV (11 kV system) | 325 mm | 1.3-1.5 m plus boxes | 800 mm |
| 24 kV (22 kV system) | 375 mm | 1.5-1.7 m plus boxes | 800 mm |
| 36 kV (33 kV system) | C-GIS cubicle, 600-800 mm per way | 2.6-3.4 m | 1,000 mm |
If the room cannot take the length, the answer is not a smaller clearance. It is either fewer ways or a different device family; see 33 kV C-GIS for the wider frame case.
Step 4: size the cable terminations
The cable box is chosen by conductor size and by how the crew terminates: bolted lugs, sliding type or elbow connectors. A 400 mm² aluminium cable needs a different box from a 95 mm² copper one, and the box adds depth to the unit that the room layout must absorb.
Ask for the cable schedule before the drawing is frozen. Changing a cable box after the tank is welded means a new box, not a new tank, but it still costs a week.
Step 5: protection and operation
The load way’s protection decides the device: fuse, relay with a motorised mechanism, or a breaker way. A fuse is cheapest and has no settings to coordinate; a relay allows remote indication and a definite trip curve.
If the unit will be operated remotely or monitored over SCADA, say so at sizing stage. Adding a motor and an RTU later is possible, adding the interlocking for it is not.
The sizing sheet in one line
Fault level and duration, way count including spare, module width against room, cable box against cable schedule, protection against operating practice. Five lines, and every one of them is cheaper to settle before the tank is welded.
Related: how a gas-insulated RMU is built, and the full switchgear range.