Applications

Where these units are installed

◎

Utility ring networks

Loop supply, double supply and switching kiosks for 12–33 kV urban distribution.

☀

Solar & wind

Collector circuits and grid-tie interfaces at inverter and turbine stations.

▤

Industrial plants

Steel, cement, chemical, mining — high fault level, harsh ambient, limited room.

⌂

Underground & transit

Metro, tunnel and basement vaults where every square metre is rented.

Installations

Where these units end up

Utility loops, industrial spurs, solar collector circuits and underground vaults — the same sealed platform, different configurations.

Six places these units actually end up

A gas-insulated ring main unit is bought for a location, not for a catalogue. In practice our units leave Yueqing for six kinds of site: urban distribution loops under city streets, industrial parks with their own 11–33 kV network, wind and solar collector substations, ports and airports where cable rooms are tight, mines and cement plants at 33 kV, and packaged kiosk substations where the whole room ships on a truck.

Each of those sites imposes a different constraint. A city loop is limited by the vault already under the pavement — module width decides whether the unit goes in. A wind collector is limited by switching frequency and by the ambient temperature swing. A port is limited by salt fog, which is why the IP67 tank and the anti-corrosion treatment matter more than the current rating.

What this means for your project

  • Urban ring loops — four-module ring positions in existing vaults; the 325 mm module width at Um 12 kV is the deciding number.
  • Industrial parks — mixed 11 kV and 22 kV networks on one site; a shared mechanism family keeps spares and training common.
  • Wind and solar collectors — high switching duty, wide ambient range, outdoor kiosks; specified on mechanical endurance, not only kA.
  • Ports and airports — salt fog and dust; IP67 sealed tank, sealed cable compartments, corrosion-resistant hardware.
  • Mines and heavy plants — 33 kV C-GIS sections in compact substations where an air-insulated panel will not fit.
  • Kiosk and container substations — unit factory-assembled with the enclosure and tested before it ships.
Distribution switchgear row
Distribution switchgear row
Panel lineup, routine test bay
Panel lineup, routine test bay
Multi-panel RMU, project build
Multi-panel RMU, project build